TECHNICAL SUPPORT
Technical capability translated intoclear sourcing decisions.
Use this capability matrix as an early project-screening guide. Final limits are confirmed against the selected manufacturing site, material system, stack-up and order volume.
PCB CAPABILITY MATRIX
Screen the process route before quotation.
The matrix below converts the original image-based technical sheet into accessible, searchable text. It separates prototype capability from repeat-volume capability so engineering and purchasing teams can review the relevant limits quickly.
Values are a sourcing reference, not a universal guarantee. Final capability depends on material, copper weight, stack-up interaction, panel utilization and the selected partner site.
TECHNICAL CAPABILITY
Prototype and volume capability comparison.
Scroll horizontally on a small screen. The item column remains visible while you compare values.
| No. | Item | Sample order ≤2 m² | Volume order >20 m² |
|---|---|---|---|
| 1 | Layer count | 1–24 layers | 12 layers |
| 2 | Usual base material | FR-4; high-frequency board; aluminium base board; Rogers; high-Tg; copper base board | FR-4; high-frequency board; aluminium base board; Rogers; high-Tg |
| 3 | Final board thickness | 0.15–4.00 mm (6–196 mil) | 0.40–4.00 mm (16–157 mil) |
| 4 | Minimum core thickness (excluding copper) | 0.075 mm (3 mil) | 0.10 mm (4 mil) |
| 5 | Final copper thickness |
|
|
| 6 | Minimum trace width / space before compensation |
|
|
| 7 | Minimum hole size | 0.15 mm (6 mil) blind via; 0.20 mm PTH hole | 0.20 mm |
| 8 | Aspect ratio | 14:1 | 10:1 |
| 9 | Dimensional tolerance |
|
|
| 10 | Surface finishing | HAL; lead-free HAL; immersion gold; immersion tin; immersion silver; OSP; hard gold; carbon ink | HAL; lead-free HAL; immersion gold; immersion tin; immersion silver; OSP; hard gold; carbon ink |
| 11 | Maximum finished size |
|
|
| 12 | V-cutting |
|
|
| 13 | Slot tolerance |
|
|
| 14 | Gold finger |
|
|
| 15 | Minimum hole-to-hole edge spacing after compensation |
|
|
| 16 | Minimum hole-to-circuit gap |
|
|
Capability must be reconfirmed during quotation and engineering review. Where requirements interact, the most restrictive combined condition applies.
START A PROJECT REVIEW
Have a demanding stack-up or tolerance?
Send the fabrication drawing, stack-up, materials, copper weights, quantities and target schedule for an engineering review.